Well after trying to run some double headed power with a train around the reverse loop, I was still having intermittent problems with a short in the location where the turnout off the main leads into the short section of track and the crossing for the interchange track. If I ran the locomotives uncoupled but, still consisted, there was no problem and then sometimes with them coupled there were no problems. I thought maybe a short through the couplers and the locomotive frames may have been a possibility. There were no problems with a single four axle unit or six axle unit running through. With more discussion with a friend, it was determined that there was just to much going on in that area and the DCC Specialists auto reverser couldn't keep up with it all, plus the transition from the turnout to the crossing isn't the most favorable one. This makes a case for me to learn how to make a hand laid crossing here sometime in the future with the correct angle to further smooth out the transition. It was kind of tough to get that short little section of track to curve the way it needed to. After the discussion, it was decided to move the insulated gap from the turnout just off the main to just before the open ended turn out a few feet from the crossing. With fingers crossed, the move was made. The picture below shows the change. The red circle was the old location for the gap and the yellow circle shows the new location for the gap.
A proto-freelanced model railroad in HO scale based on the idea of "What If" the DRGW had reached El Paso Texas.
Sunday, May 15, 2022
A Reverse Loop Headache, Problem Solved!
Tuesday, May 10, 2022
A Reverse Loop Upgrade
Friday, November 12, 2021
Mainline Track Installation Complete
I have to say there has been plenty of progress since my last post.
I have run Romex and installed double ganged plugs for 120 volt power at points under the bottom level. This was done to supply the power to the command station and booster power districts power supplies, and layout lighting. This also makes it possible to turn on/off power to the entire layout with one wall switch. I also had to modify the boosters power supplies with a "delay on relay" and setting them to activate the boosters power supplies ten seconds after the command station came on. Digitrax boosters have known to confuse the command station if every thing were to come to life at the same time.
On October 27, 2021 at 9:39 pm, the last section of track was installed on the Colorado & Rio Grande Central Railroad's mainline. Yeah!! Party On!!! The last section of track was installed in the town that will be known as Orogrande, NM. From what I figured using figures from XtrakCAD, the total mainline run and mainline only is 476.5 feet, give or take three feet. For a total run, not bad, I thought. The double track helix has 210 feet of track all together making the helix single line 105 feet roughly.
Along with completion of the mainline I was able to complete track work for El Paso yard lead, arrival/departure tracks and related turnouts, caboose track, tracks for locomotive servicing facility, the return track to the mainline and southern turnout ladder for the arrival/departure tracks that make up the reverse loop. There was a track installed with a crossing on the main to represent an interchange with Southern Pacific along with two tracks for an interchange yard, and a siding for Orogrande which runs to El Paso.
Friday, June 18, 2021
El Paso Yard
Over the past several months I have been taking on the task of getting the bench work prep for El Paso Yard, and El Paso Yard installed so the mainline could be continued. I also modified an unused automotive creeper to be an under the layout creeper.
The first step was getting the subroad bed installed and painted so track and turnouts for El Paso Yard could be installed.
After painting was finished, track and turnout laying took place. I realized that I had run out of Kadee under the track uncoupling magnets (the black squares) so the yard sat partly finished in the photo above as I waited for those to arrive.
Here is El Paso Yard completed. The 4 yard tracks curving to the left are for roadbed supports and in the future bridge supports for the mainline to curve over the yard.
After the glue had set up, I was able to continue installation of the cork roadbed and mainline track. Both the approach and decent from the bridge were made easy with Woodland Scenics 2% riser sets. The above photo shows the main line approaching the bridge to span over the yard.
The above 2 photos shows the curved mainline roadbed support. Which someday in the future will have a scratch built bridge to replace the plywood support shown here. It may be some time before this is completed for the fact that I have never scratch built anything and don't have a clue as how to accomplish it.
The completed yard with the mainline decent to the right. Next project will be to clear off the misc. building materials on the other lower peninsula so the mainline can be completed with the reverse loop, the city of Orogrande, and connections to El Paso yard. After all this is completed, the tedious task of wiring will have to be done. Ugh!
I took and an unused automotive creeper and turned it into and under the layout creeper. I needed one of these or something close to it to make it easier to wire and perform other activities that will need to be attended to under the layout on the lower level with out having to crawl around on the floor. This is what I came up with.
If you like the blog please comment and sign up for email notices to follow along.
Sunday, April 04, 2021
C&RGC Railroad MAP and LOGO
I have spent some time over the last month or so deciding on a logo for the C&RGC RailRoad. Between layout work sessions, I've tried to get my creative juices flowing so I could come up with a system map for the railroad and to incorporate the logo also. The system map was created in about two to three weeks, with tons of re-dos. Thank goodness for Google maps and Microsoft paint programs which made the creation easier than I thought and I had some fun doing it too.
The first project was creating a logo for the railroad. After about a week of trying different free logo creation programs on the web I settled on Canva.com. It was able to let me establish a logo for the railroad. I wanted a logo that was simple and different at the same time. I finally decided on the logo below.
With the logo created, I was able to move onto the next project, creating a system map. I used Google maps to create the routing. I used the print screen function on the computer and pasted it into Microsoft Paint. With Paint, I was able to erase all the map details except the routing and town names and added text where needed, the two railroad logos, and other details. I was also able to copy and paste the routing for Yrbi. I'm not sure if this will be the final version but it gives me a little satisfaction to have a system map. If future updates are made the final versions will be posted to the blog. The system map is shown below. Note: The town names are actual existing towns on a google map except for Yrbi which is my fictitious branchline town.
Friday, February 26, 2021
Progress Continues
TOWN NAMES
It's been a while since my last post to the blog so, I'll dive right into what has been happening on the layout. I have decided on names for the towns on the layout including one town I changed the name of, that has appeared in earlier posts to the blog. Note: Besides Santa Fe, El Paso, and Yrbi, unless otherwise mentioned, it has not been decided as to the types of industries or the number of industries that will occupy these towns. I'm trying to focus on getting mainline track completed so as to have a continuous loop without having to reverse a train in the opposite direction.
First, Santa Fe, NM, the northern most town along with Denver and Salt Lake City represented by long staging tracks near Santa Fe Yard. I have also mentioned these towns in earlier posts.
Continuing southward is Clines Corner, NM which is just a town name on the railroad with no services provided by the railroad. I thought it would be a clever play on the name since the track sweeps through a left hand turn in the corner of the layout room, in essence it's just a name of a block of track on the railroad.
Town names continuing southward are as follows: Encino, NM, then Duran, NM, which will have Yrbi Junction interchange for interchange traffic to the branchline town of Yrbi along with a couple other undecided industries.
Next is Carrizozo, NM, which is the town I changed the name of. This town used to be called Summit. This town will have spur tracks for trains to pickup or drop off dummy helper locomotives to traverse the helix as to enhance operations along with other industries.
Next is Oscuro, NM, which is located halfway down the helix or halfway up the helix depending on the direction of train travel. No services provided by the railroad.
Tularosa, NM is the next town's name and is on the bottom level to the right of the helix. This town will also have spur tracks for pickup and drop off of dummy locomotives to traverse the helix. This town will also have way freight industries along with a large industry on the left side of the helix underneath the upper level branch line town of Yrbi.
The next town is Alamogordo, NM, then Orogrande, NM, then finally El Paso, Texas. One project I would like to tackle is to make a map drawing of the railroad so that I have something to reference. When this is completed I will post it to the blog.
BOTTOM LEVEL CONSTRUCTION
Track construction continued with the beginnings of construction on the bottom level at the bottom of the helix in Tularosa, YAAAY!! Mainline track was installed with turnouts for the helper locomotive spur tracks and turnouts for the lead track around the outside of the helix to the large industry just left of the helix. There will be a spur for an industry along the west wall of the layout room.
The double track mainline coming from the helix combines into one track via a turnout at the north end of Alamogordo. The track continues and reaches a curve at the end of the peninsula and starts to gain elevation to go over the mainline, and over the to be constructed southern end of El Paso yard.
Friday, October 02, 2020
Yrbi and Layout Updates
Yrbi
Things have progressed quite well in the terminus of the Yrbi branch line, known none other as the town of Yrbi. Just in case there is a question on pronunciation it is, YUR-bee. I came up with the name of Yrbi from listening to dramitized story by Louis L'amor on CD. One of the characters last name in the story was Yrbi.
The grain elevator has been constructed along with one silo add on kit, both are Walthers kits, and placed in position. The yard ladder, spur tacks for the grain elevator, and a runaround track have been installed. There also was enough room to install tracks for two more industries for the town of Yrbi. These industries have not been decided on as of yet. It is planned that operations for Yrbi will be provided by a local switching job that will run to the interchange at Yrbi junction in Duran. The local job will pickup/drop off cuts of cars from/for mainline trains from/for destinations north and south on the mainline then return on the branch and switch those cuts of cars for the local industries at Yrbi. No mainline trains will be allowed on the branch. Turnout control will be provided by ground throws that are reachable. For the non reachable turnouts I plan on using Fast Tracks Bullfrog turn out controls. https://www.handlaidtrack.com/bullfrogs These will be used for the turnout ladder for the spur tracks for the grain elevator. I also plan on using these temporarily where needed on the mainline until automation for the mainline turnouts can be installed.
Town of Yrbi.